2012 Photos |
 |
 |
 |
LUD’s installed at P2N.
(Sep. 6) Photo: Michael Owen |
Bridge deck interior curb formwork removed.
(Aug. 13) Photo: Michael Owen |
Adjusting the bridge longitudinally
(Aug. 13) Photo: Michael Owen |
 |
 |
 |
South abutment earthworks
(Aug. 13) Photo: Michael Owen |
Guardrail posts installed on curb
(Aug. 13) Photo: Michael Owen |
Installing guardrail posts
(Aug. 13) Photo: Michael Owen |
 |
 |
 |
Placing infill concrete
(Aug. 12) Photo: Michael Owen |
Transporting concrete to infills with wheelbarrows
(Aug. 12) Photo: Michael Owen |
Pouring curb concrete
(Aug. 11) Photo: Michael Owen |
 |
 |
 |
| General view of deck panels (looking north) (Aug. 3) Photo: Dennis Hicks |
South approach earthworks (Aug. 3) Photo: Dennis Hicks |
Backfilling and waterproof sealer at South abutment. (Aug. 2) Photo: Keenan Ngo |
 |
 |
 |
Panel placement passing P1S
(Aug. 2) Photo: Keenan Ngo |
Concrete finishing of the South abutment electrical room ceiling
(July 26) Photo: Keenan Ngo |
South approach earthworks
(July 24) Photo: Dennis Hicks |
 |
 |
 |
Deck panel placement at P3S.
(July 24) Photo: Keenan Ngo |
Curb formwork between N abutment and P1N (July 24) Photo: Keenan Ngo |
North abutment approach slab rebar.
(July 24) Photo: Keenan Ngo |
 |
 |
 |
WIM cameras and sensors being installed
(July 22) Photo: Dennis Hicks |
South abutment walls casted.
(July 21) Photo: Dennis Hicks |
Double crane pick of panel P163 at Pier 4S. (July 18) Photo: Keenan Ngo |
 |
 |
 |
Infill panel concrete placed by crane and bucket from barge
(July 16) Photo: Keenan Ngo |
Cutting geofoam blocks for placement at North abutment
(July 15) Photo: Keenan Ngo |
Night time pour of South Abutment (60m3)
(July 14) Photo: Keenan Ngo |
 |
 |
 |
Snowbirds flying over the bridge.
(July 13) Photo: Michael Owen |
Snowbirds flying over the bridge.
(July 13) Photo: Michael Owen |
Hanging scaffolding at 20N spar frame
(July 12) Photo: Keenan Ngo |
 |
 |
 |
| Day 2 of concrete infills at the North end of the deck. (July 12) Photo: Keenan Ngo |
Placement of deck panel 139, half way across the bridge.
(July 12) Photo: Keenan Ngo |
Concrete finishing of the deck infills.
(July 11) Photo: Keenan Ngo |
 |
 |
 |
First deck panel joint pour
(July 11) Photo: Dennis Hicks |
Formwork and rebar placement at the South abutment. (July 9)
Photo: Keenan Ngo |
(July 8) Photo: Ron Bonnetrouge |
 |
 |
 |
South abutment reinforcing steel/formwork
(July 5) Photo: Dennis Hicks |
Deck panel placement on the main span
(July 5) Photo: Dennis Hicks |
Placing deck panel adjacent to P4S A-pylon with two cranes
(July 4) Photo: Dennis Hicks |
 |
 |
 |
South abutment formwork and rebar placement
(July 3) Photo: Dennis Hicks |
Deck panel grouting approaching P4N
(July 2) Photo: Dennis Hicks |
South abutment formwork started
(June 30) Photo: Dennis Hicks |
 |
 |
 |
North abutment prepped for backfilling
(June 29) Photo: Dennis Hicks |
Analysis of movement in a turnbuckle
(June 26) Photo: Keenan Ngo |
Scanning of a turnbuckle
(June 26) Photo: Keenan Ngo |
 |
 |
 |
| Excitement of the spar cable by rubber mallet (June 25) Photo: Keenan Ngo |
Analysis on the computer
(June 25) Photo: Keenan Ngo |
Laser Vibrometer aimed at the spar cables
(June 25) Photo: Keenan Ngo |
 |
 |
 |
Laser vibrometer setup
(June 25) Photo: Keenan Ngo |
Removing temporary bridge deck in preparation for installing deck panels
(June 17) Photo: Michael Owen |
Installing exterior formwork
(June 17) Photo: Michael Owen |
 |
 |
 |
Installing exterior formwork
(June 17) Photo: Michael Owen |
General view of formwork from north ferry landing (June 17) Photo: Michael Owen |
Installing neoprene for under deck panel
(June 17) Photo: Michael Owen |
 |
 |
 |
Reaming guardrail bolt holes
(June 16) Photo: Michael Owen |
Mixing grout for the deck panels
(June 16) Photo: Michael Owen |
Installing the first deck panel from P3N towards the south abutment. (June 15) Photo: Dennis Hicks |
 |
 |
 |
| General view with truss access closed to P3N
(June 14) Photo: Dennis Hicks |
Top of truss deck panel grouting and exterior formwork installation
(June 14) Photo: Dennis Hicks |
Finalizing P4S jack down
(June 12) Photo: Dennis Hicks |
 |
 |
 |
Installing deck panel exterior formwork on the north span #1
(June 12) Photo: Dennis Hicks |
Starting jack down at P4S
(June 10) Photo: Dennis Hicks |
(June 8) Photo: Dennis Hicks |
 |
 |
 |
| (June 8) Photo: Dennis Hicks |
Shuffling equipment on the south truss (June 7) Photo: Dennis Hicks |
Pier 4S pylon with falsework almost removed (June 5) Photo: Dennis Hicks |
 |
 |
 |
| Installing deck panel interior formwork (nearing P3N)
(June 5) Photo: Dennis Hicks |
Removing Pier 4S pylon falsework
(June 4) Photo: Dennis Hicks |
After completion of ropes installation; view from ferry.
(June 2) Photo: Colin Macleod |
 |
 |
 |
| Installing grout between panels and truss chords (June 2) Photo: Dennis Hicks |
All Pier 4S pylon cables connected
(June 1) Photo: Dennis Hicks |
Installing exterior deck panel formwork
(May 31) Photo: Dennis Hicks |
 |
 |
 |
| Surveying in P4S backstay spar cable connection points. (May25) Photo: Dennis Hicks |
First set of P4S backstay cables connected. (May25) Photo: Dennis Hicks |
Bridge Flyover
(May24) Video: Leslie Mihalek |
 |
 |
 |
| Jacking in the first set of P4S backstay cables. (May24) Photo: Dennis Hicks |
Installing last deck panel from north side (panels now in place from P3N to north abutment). (May19) Photo: Dennis Hicks |
P4S forestay cable installation in progress. (May18) Photo: Dennis Hicks |
 |
 |
 |
| Pulling FS1E towards the spar frame (May13) Photo: Michael Owen |
Attaching FS1E to the south pylon (May13) Photo: Michael Owen |
General overview from the south side (May13) Photo: Michael Owen |
 |
 |
 |
| Both FS1 cables installed (looking north) (May13) Photo: Michael Owen |
Pulling FS1W towards the spar frame (May12) Photo: Michael Owen |
Making pin connection of FS1W at the south pylon (May12) Photo: Michael Owen |
 |
 |
 |
Installing deck panel exterior formwork on the north span #1
(June 12) Photo: Dennis Hicks |
Starting jack down at P4S
(June 10) Photo: Dennis Hicks |
(June 8) Photo: Dennis Hicks |
 |
 |
 |
| (June 8) Photo: Dennis Hicks |
Shuffling equipment on the south truss (June 7) Photo: Dennis Hicks |
Pier 4S pylon with falsework almost removed (June 5) Photo: Dennis Hicks |
 |
 |
 |
| Installing deck panel interior formwork (nearing P3N)
(June 5) Photo: Dennis Hicks |
Removing Pier 4S pylon falsework
(June 4) Photo: Dennis Hicks |
After completion of ropes installation; view from ferry.
(June 2) Photo: Colin Macleod |
 |
 |
 |
| Installing grout between panels and truss chords (June 2) Photo: Dennis Hicks |
All Pier 4S pylon cables connected
(June 1) Photo: Dennis Hicks |
Installing exterior deck panel formwork
(May 31) Photo: Dennis Hicks |
 |
 |
 |
| Surveying in P4S backstay spar cable connection points. (May25) Photo: Dennis Hicks |
First set of P4S backstay cables connected. (May25) Photo: Dennis Hicks |
Bridge Flyover
(May24) Video: Leslie Mihalek |
 |
 |
 |
| Jacking in the first set of P4S backstay cables. (May24) Photo: Dennis Hicks |
Installing last deck panel from north side (panels now in place from P3N to north abutment). (May19) Photo: Dennis Hicks |
P4S forestay cable installation in progress. (May18) Photo: Dennis Hicks |
 |
 |
 |
| Pulling FS1E towards the spar frame (May13) Photo: Michael Owen |
Attaching FS1E to the south pylon (May13) Photo: Michael Owen |
General overview from the south side (May13) Photo: Michael Owen |
 |
 |
 |
| Both FS1 cables installed (looking north) (May13) Photo: Michael Owen |
Pulling FS1W towards the spar frame (May12) Photo: Michael Owen |
Making pin connection of FS1W at the south pylon (May12) Photo: Michael Owen |
 |
 |
|
Placement of final deck panel P278
(Aug. 2) Photo: Keenan Ngo |
Lifting of final deck panel using 7150 crane
(Aug. 2) Photo: Keenan Ngo |
|
 |
 |
 |
| General view of deck panels (looking north) (Aug. 3) Photo: Dennis Hicks |
South approach earthworks (Aug. 3) Photo: Dennis Hicks |
Backfilling and waterproof sealer at South abutment. (Aug. 2) Photo: Keenan Ngo |
 |
 |
 |
Panel placement passing P1S
(Aug. 2) Photo: Keenan Ngo |
Concrete finishing of the South abutment electrical room ceiling
(July 26) Photo: Keenan Ngo |
South approach earthworks
(July 24) Photo: Dennis Hicks |
 |
 |
 |
Deck panel placement at P3S.
(July 24) Photo: Keenan Ngo |
Curb formwork between N abutment and P1N (July 24) Photo: Keenan Ngo |
North abutment approach slab rebar.
(July 24) Photo: Keenan Ngo |
 |
 |
 |
WIM cameras and sensors being installed
(July 22) Photo: Dennis Hicks |
South abutment walls casted.
(July 21) Photo: Dennis Hicks |
Double crane pick of panel P163 at Pier 4S. (July 18) Photo: Keenan Ngo |
 |
 |
 |
Infill panel concrete placed by crane and bucket from barge
(July 16) Photo: Keenan Ngo |
Cutting geofoam blocks for placement at North abutment
(July 15) Photo: Keenan Ngo |
Night time pour of South Abutment (60m3)
(July 14) Photo: Keenan Ngo |
 |
 |
 |
Snowbirds flying over the bridge.
(July 13) Photo: Michael Owen |
Snowbirds flying over the bridge.
(July 13) Photo: Michael Owen |
Hanging scaffolding at 20N spar frame
(July 12) Photo: Keenan Ngo |
 |
 |
 |
| Day 2 of concrete infills at the North end of the deck. (July 12) Photo: Keenan Ngo |
Placement of deck panel 139, half way across the bridge.
(July 12) Photo: Keenan Ngo |
Concrete finishing of the deck infills.
(July 11) Photo: Keenan Ngo |
 |
 |
 |
First deck panel joint pour
(July 11) Photo: Dennis Hicks |
Formwork and rebar placement at the South abutment. (July 9)
Photo: Keenan Ngo |
(July 8) Photo: Ron Bonnetrouge |
 |
 |
 |
South abutment reinforcing steel/formwork
(July 5) Photo: Dennis Hicks |
Deck panel placement on the main span
(July 5) Photo: Dennis Hicks |
Placing deck panel adjacent to P4S A-pylon with two cranes
(July 4) Photo: Dennis Hicks |
 |
 |
 |
South abutment formwork and rebar placement
(July 3) Photo: Dennis Hicks |
Deck panel grouting approaching P4N
(July 2) Photo: Dennis Hicks |
South abutment formwork started
(June 30) Photo: Dennis Hicks |
 |
 |
 |
North abutment prepped for backfilling
(June 29) Photo: Dennis Hicks |
Analysis of movement in a turnbuckle
(June 26) Photo: Keenan Ngo |
Scanning of a turnbuckle
(June 26) Photo: Keenan Ngo |
 |
 |
 |
| Excitement of the spar cable by rubber mallet (June 25) Photo: Keenan Ngo |
Analysis on the computer
(June 25) Photo: Keenan Ngo |
Laser Vibrometer aimed at the spar cables
(June 25) Photo: Keenan Ngo |
 |
 |
 |
Laser vibrometer setup
(June 25) Photo: Keenan Ngo |
Removing temporary bridge deck in preparation for installing deck panels
(June 17) Photo: Michael Owen |
Installing exterior formwork
(June 17) Photo: Michael Owen |
 |
 |
 |
Installing exterior formwork
(June 17) Photo: Michael Owen |
General view of formwork from north ferry landing (June 17) Photo: Michael Owen |
Installing neoprene for under deck panel
(June 17) Photo: Michael Owen |
 |
 |
 |
Reaming guardrail bolt holes
(June 16) Photo: Michael Owen |
Mixing grout for the deck panels
(June 16) Photo: Michael Owen |
Installing the first deck panel from P3N towards the south abutment. (June 15) Photo: Dennis Hicks |
 |
 |
 |
| General view with truss access closed to P3N
(June 14) Photo: Dennis Hicks |
Top of truss deck panel grouting and exterior formwork installation
(June 14) Photo: Dennis Hicks |
Finalizing P4S jack down
(June 12) Photo: Dennis Hicks |
 |
 |
 |
Installing deck panel exterior formwork on the north span #1
(June 12) Photo: Dennis Hicks |
Starting jack down at P4S
(June 10) Photo: Dennis Hicks |
(June 8) Photo: Dennis Hicks |
 |
 |
 |
| (June 8) Photo: Dennis Hicks |
Shuffling equipment on the south truss (June 7) Photo: Dennis Hicks |
Pier 4S pylon with falsework almost removed (June 5) Photo: Dennis Hicks |
 |
 |
 |
| Installing deck panel interior formwork (nearing P3N)
(June 5) Photo: Dennis Hicks |
Removing Pier 4S pylon falsework
(June 4) Photo: Dennis Hicks |
After completion of ropes installation; view from ferry.
(June 2) Photo: Colin Macleod |
 |
 |
 |
| Installing grout between panels and truss chords (June 2) Photo: Dennis Hicks |
All Pier 4S pylon cables connected
(June 1) Photo: Dennis Hicks |
Installing exterior deck panel formwork
(May 31) Photo: Dennis Hicks |
 |
 |
 |
| Surveying in P4S backstay spar cable connection points. (May25) Photo: Dennis Hicks |
First set of P4S backstay cables connected. (May25) Photo: Dennis Hicks |
Bridge Flyover
(May24) Video: Leslie Mihalek |
 |
 |
 |
| Jacking in the first set of P4S backstay cables. (May24) Photo: Dennis Hicks |
Installing last deck panel from north side (panels now in place from P3N to north abutment). (May19) Photo: Dennis Hicks |
P4S forestay cable installation in progress. (May18) Photo: Dennis Hicks |
 |
 |
 |
| Pulling FS1E towards the spar frame (May13) Photo: Michael Owen |
Attaching FS1E to the south pylon (May13) Photo: Michael Owen |
General overview from the south side (May13) Photo: Michael Owen |
 |
 |
 |
| Both FS1 cables installed (looking north) (May13) Photo: Michael Owen |
Pulling FS1W towards the spar frame (May12) Photo: Michael Owen |
Making pin connection of FS1W at the south pylon (May12) Photo: Michael Owen |
 |
 |
 |
Ice flow (from P4S looking north)
(May12) Photo: Michael Owen |
North deck panels looking south
(May 12) Photo: Michael Owen |
Ice at pier 4N
(May 9) Photo: Michael Owen |
 |
 |
 |
Ice at pier 3N
(May 9) Photo: Michael Owen |
Ice at pier 4N
(May 9) Photo: Michael Owen |
Overview from the north ferry landing, ice flow on the river
(May 9) Photo: Michael Owen |
 |
 |
 |
Ice at pier 3N
(May 9) Photo: Michael Owen |
Ice at pier 2N
(May 9) Photo: Michael Owen |
Preparing to hoist the first forestay cable for P4S (May 9) Photo: Michael Owen |
 |
 |
 |
| Unspooling the first forestay cable for P4S (May 9) Photo: Michael Owen |
Welding inside P4S crown hoarding
(May 6) Photo: Dennis Hicks |
P4S crown hoarding
(May 6) Photo: Dennis Hicks |
 |
 |
 |
General view looking north
(May 6) Photo: Dennis Hicks |
"Supermoon" over the bridge
(May 5) Photo: Bill Braden |
"Supermoon" over the bridge
(May 5) Photo: Bill Braden |
 |
 |
 |
Decking in spar frame in preparation for south side cable installation
(May 5) Photo: Dennis Hicks |
Aerial shot showing progress on the northside deck panel placement, installation of the truss work decks and south A-pylon erection
(May 4) Photo: Bill Braden |
Aerial shot showing progress on the northside deck panel placement, installation of the truss work decks and south A-pylon erection
(May 4) Photo: Bill Braden |
 |
 |
 |
Installing pre cast deck panels
(May 3) Photo: Dennis Hicks |
Crown installed onto the pylon
(May 1) Photo: Dennis Hicks |
Hoisting crown onto the pylon
(May 1) Photo: Dennis Hicks |
 |
 |
 |
Hoisting P4S pylon crown onto the truss
(May 1) Photo: Dennis Hicks |
(Apr. 30) Photo: Dennis Hicks |
(Apr. 30) Photo: Dennis Hicks |
 |
 |
 |
Both P4S upper pylon legs installed
(Apr. 28) Photo: Dennis Hicks |
Hoisting P4S west upper pylon leg
(Apr. 28) Photo: Dennis Hicks |
Reinforcing steel iron workers installing deck rebar. (Apr. 28) Photo: Dennis Hicks |
 |
 |
 |
General view (looking north)
(Apr. 24) Photo: Dennis Hicks |
Installing P4S A-pylon strut
(Apr. 23) Photo: Dennis Hicks |
Crane loading cross-tie for A-pylon from span 1 of work bridge, site overview, A-pylon d/s lower leg erected.
(Apr. 22) Photo: Ann Lanteigne |
 |
 |
 |
Lots of activity near the south abutment – crane loading A-pylon u/s lower leg, crane on deck mods, deck mods & A-pylon on the ground, d/s lower A-pylon leg in place at falsework P4S.
(Apr. 22) Photo: Dennis Hicks |
Laying deck panels from P3N to N Abutment, workers tied-off
(Apr. 21) Photo: Dennis Hicks |
Level check
(Apr. 16) Photo: Dennis Hicks |
 |
 |
 |
General view looking south
(Apr. 16) Photo: Dennis Hicks |
Deck panel placement 2
(Apr. 16) Photo: Dennis Hicks |
Deck panel placement 1
(Apr. 16) Photo: Dennis Hicks |
 |
 |
 |
Placing 5th deck panel at P3N
(Apr. 14) Photo: Dennis Hicks |
Placing 5th deck panel at P3N
(Apr. 14) Photo: Dennis Hicks |
P4S pylon leg bearing
(Apr. 14) Photo: Dennis Hicks |
 |
 |
 |
Placing the fifth deck panel
(Apr. 14) Photo: Dennis Hicks |
Hoisting deck panel up on the truss
(Apr. 14) Photo: Dennis Hicks |
Placing 1st deck panel at P3N
(Apr. 12) Photo: Dennis Hicks |
 |
 |
 |
Installing the first pre-cast deck panel
(Apr. 12) Photo: Dennis Hicks |
General view looking south
(Apr. 11) Photo: Dennis Hicks |
P4S pylon leg bearing
(Apr. 10) Photo: Dennis Hicks |
 |
 |
 |
General view looking nouth
(Apr. 10) Photo: Dennis Hicks |
Assembling P4S pylon falsework
(Apr. 10) Photo: Dennis Hicks |
P4S pylon leg bearing
(Apr. 08) Photo: Dennis Hicks |
 |
 |
 |
Installing South truss acess & workbridge removal
(Apr. 08) Photo: Dennis Hicks |
Assembling Pier 4S pylon falsework
(Apr. 06) Photo: Dennis Hicks |
Assembling Pier 4S pylon falsework
(Apr. 06) Photo: Dennis Hicks |
 |
 |
 |
General View from the north
(Apr. 06) Photo: Dennis Hicks |
Assembling Pier 4S pylon falsework
(Apr. 06) Photo: Dennis Hicks |
Hoisting crane on south truss
(Apr. 06) Photo: Adam Kryschuk |
 |
 |
 |
Installing south truss access
(Apr. 02) Photo: Dennis Hicks |
Assembling P4S pylon falsework & work bridge removal
(Apr. 02) Photo: Dennis Hicks |
Northern Lights
(Mar. 28) Photo: Arc Rajtar |
 |
 |
 |
Northern Lights
(Mar. 28) Photo: Arc Rajtar |
Pier 1S jack down
(Mar. 27) Photo: Dennis Hicks |
Panorama (Mar. 27) Photo: Arc Rajtar |
 |
 |
 |
| Panorama (Mar. 27) Photo: Arc Rajtar |
Panorama (Mar. 27) Photo: Arc Rajtar |
(Mar. 26) Photo: Arc Rajtar |
 |
 |
 |
Pier 2S jack down
(Mar. 25) Photo: Dennis Hicks |
P4N A-pylon
(Mar. 24) Photo: Gavin Fitzgerald |
Overview of the center span
(Mar. 14) Photo: Michael Owen |
 |
 |
 |
General overview from south side
(Mar. 14) Photo: Michael Owen |
TB5S crown being removed
(Mar. 14) Photo: Michael Owen |
Disassembled temp bent
material on workbridge
(Mar. 12) Photo: Michael Owen |
 |
 |
 |
TB4S removal
(Mar. 9) Photo: Michael Owen |
P4S Jacked and Bearings installed
(Mar. 7) Photo: Michael Owen |
Top chord closure connected
(Feb. 26) Photo: Dennis Hicks |
 |
 |
 |
Installing top chord closure bolts
(Feb. 26) Photo: Dennis Hicks |
Jacking top chord for spice connection (Feb. 25) Photo: Dennis Hicks |
Jacking top chord for spice connection
(Feb. 25) Photo: Dennis Hicks |
 |
 |
 |
Torqueing diagonal connection bolts
(Feb. 26) Photo: Dennis Hicks |
Installing bolts in closure diagonal connection (Feb. 25)
Photo: Dennis Hicks |
Jacking apart closure top chord
(Feb. 25) Photo: Dennis Hicks |
 |
 |
 |
Torqueing bottom chord closure bolts
(Feb. 25) Photo: Dennis Hicks |
Installing bottom chord closure bolts
(Feb. 24) Photo: Dennis Hicks |
Jacking south truss to match north truss
(Feb. 24) Photo: Dennis Hicks |
 |
 |
 |
| (Feb. 17) Photo: Bill Braden |
(Feb. 17) Photo: Bill Braden |
Working out the alignment process
(Feb. 17) Photo: Bill Braden |
 |
 |
 |
Afternoon: no gap!
(Feb. 17) Photo: Bill Braden |
Ben Rhyno of All North Construction made the first crossing. (Feb. 17) Photo: Bill Braden |
(Feb. 17) Photo: Bill Braden |
 |
 |
 |
| (Feb. 17) Photo: Bill Braden |
(Feb. 17) Photo: Bill Braden |
Morning: gap.
(Feb. 17) Photo: Bill Braden |
 |
 |
 |
General view
(Feb. 17) Photo: Dennis Hicks |
Jacking for closure connection
(Feb. 17) Photo: Dennis Hicks |
Jacking for closure connection
(Feb. 17) Photo: Dennis Hicks |
 |
 |
 |
Fine tuning for closure connection
(Feb. 17) Photo: Dennis Hicks |
Aligning trusses.
(Feb. 17) Photo: Dennis Hicks |
Connecting alignment turfors
(Feb. 17) Photo: Dennis Hicks |
 |
 |
 |
Connecting alignment turfors
(Feb. 17) Photo: Dennis Hicks |
Connecting alignment turfors
(Feb. 17) Photo: Dennis Hicks |
Connecting alignment turfors
(Feb. 17) Photo: Dennis Hicks |
 |
 |
 |
Final launch in progress
(Feb. 17) Photo: Arndt Becker |
Falsework removed.
(Feb. 7) Photo: Dennis Hicks |
Removing P4N pylon falsework.
(Feb. 5) Photo: Dennis Hicks |
 |
 |
 |
Removing P4N pylon falsework.
(Feb. 5) Photo: Dennis Hicks |
41m gap.
(Jan. 21) Photo: Arc Rajtar |
North A-Pylon. 41m gap.
(Jan. 21) Photo: Arc Rajtar |
 |
 |
 |
Panoramic view from North Ferry Landing looking southbound.
(Jan. 21) Photo: Arc Rajtar |
Looking northbound, North A-Pylon and Cables. (Jan. 21) Photo: Arc Rajtar |
Moving 110T crane to P3N
(Jan. 20) Photo: Dennis Hicks |
 |
 |
 |
Connecting last truss segment.
(Jan. 20) Photo: Dennis Hicks |
General view.
(Jan. 20) Photo: Dennis Hicks |
South truss launched an additional 15
meters. (Jan. 17) Photo: Dennis Hicks |
 |
 |
 |
General view.
(Jan. 12) Photo: Dennis Hicks |
Survey of pylon and cable locations.
(Jan. 12) Photo: Dennis Hicks |
All backstay cables connected.
(Jan. 10) Photo: Dennis Hicks |
 |
 |
 |
General view of P4N A-pylon.
(Jan. 10) Photo: Dennis Hicks |
Connecting middle back stay cable
to spar. (Jan. 9) Photo: Dennis Hicks |
Connecting middle backstay cable to
crown. (Jan. 8) Photo: Dennis Hicks |